Skip to product information
1 of 7
  • ✓ Space-saving design for everyday organization
  • ✓ Practical materials for regular use
  • ✓ Simple to set up and use
  • ✓ Useful for modern homes and small spaces

Hsscblet

5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black

5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black

Regular price $53.99 USD
Regular price Sale price $53.99 USD
Sale Sold out
Shipping calculated at checkout.

Upgrade your home with smarter, more efficient organization

  • High-quality materials built for long-term use
  • Simple and practical design for everyday convenience
  • Perfect for modern homes and efficient living
  • Carefully selected for functionality and reliability

A smart solution to simplify your daily routine with minimal effort.

🚚 Free standard shipping on eligible U.S. orders $59+
🔄 30-Day Returns on eligible items
🔒 Secure Checkout
Quantity

Shipping & Returns


Free standard shipping is available on eligible U.S. orders of $59 or more.
A flat $7.90 standard shipping fee applies to eligible U.S. orders under $59.


Extended U.S. destinations, including Guam, the U.S. Virgin Islands, and
American Samoa, have separate shipping rates shown at checkout.


Orders are typically processed within 3–6 business days.
Standard U.S. delivery generally takes 5–15 business days after processing.
Extended U.S. destinations generally require an estimated 7–15 business days
in transit after processing.


Eligible items may be returned within 30 calendar days of the delivery date.


View shipping details  | 
View return details

Designed to help you organize your space efficiently, this product combines functionality with a clean, modern look. Ideal for everyday use in kitchens, bathrooms, closets, and more.

About This

  • Sturdy and Durable Metal: The 5 tiers shoe rack is made of sturdy and smooth powder coated metal tubing with corrosion resistant and high quality plastic connectors. Stable, each shelf can hold up to 11 pounds and has a long service life.
  • More large space:This expandable shoe rack holds up to 20 pairs of shoes. You can remove one layer to put boots or other large items. Besides shoes, this modern shoe racks can hold hats, books, bags, small accessories, and sundries for maximize your space!
  • Multifunctional: The black shoe rack cabinet has hanging hooks that allow you to hang commonly used items on the side hooks such as umbrellas, belts, keys, bags, hats, shopping bags, rackets, etc
  • Product Dimension: The size of 35.6"x12.2"x35.03",Put in the kitchen can be placed in the kitchen utensils and tableware. In the entrance can keep clean and tidy. The shelf in the bedroom can put miscellaneous things in the closet to keep clothes neat and tidy. Make the miscellaneous room look cleaner.
  • EASY TO ASSEMBLE: No tools needed,Free standing shoe racks includes instruction manual,You can have it assembled about 5 minutes, if you have any questions about the process, please do not hesitate to contact us at any time

Overview

  • Material : Metal
  • Mounting Type : Floor Mount
  • Room Type : Bedroom, Closet, Hallway
  • Shelf Type : Tiered Shelf
  • Number of Shelves : 5
  • Special Feature : Adjustable
  • Product Dimensions : 35.6"D x 12.2"W x 35.03"H
  • Shape : Rectangular
  • Style : Modern,Adjustable,Versatile
  • Finish Type : Powder Coated
View full details

⭐ Rated 4.9/5 by verified customers